伊拉克纳西里耶储油库项目通信散材招标公告
日期:2024-11-19
收藏项目
一、招标条件Tendering Conditions
招标人为****局伊拉克纳西里耶储油库项目部,项目资金来源已落实。本招标项目已按要求履行了相关报批及备案等手续,具备招标条件,现进行公开招标。
The project has implemented relevant procedures according to rules, regulations, and laws .as well as the capital has been confirmed. Now we hereby invite your esteemed company to participate in this bid. The tenderee is China Petroleum Pipeline Engineering Company Ltd (EPC) for New Nassiriya Depot Project, IraqDepartment.
二、项目概况与招标范围 Project Overview and Tendering Scope
********项目概况:伊拉****公司(State Company for Oil Project)计划在纳西里耶投资新建一个400万桶原油的罐区,用于接收Ahdeb、Badra、Gharaf、Nassiriya和Abu Amood油田的原油,项目一期计划建设252万桶库容量(7个********m³浮顶储罐),项目二期计划建设126万桶库容量(3个********m³浮顶储罐)。CPP作为该项目一期阶段的EPC总承包商,负责7个********m³原油储罐、2个******** m³的原油泄压储罐,2个******** m³水储罐建设,以及储罐区配套的泵站、计量、取水、发电、通信、工艺管线、消防等系统设计、采办、施工、试运工作。
Iraq's State Company for Oil Project plans to invest in a new 4 million barrel tank farm in Nasiriyah to receive crude from the Ahdeb, Badra, Gharaf, Nassiriya and Abu Amood fields. The first phase of the project plans to build ******** million barrels of storage capacity (7 66,000m ³ floating roof storage tanks), and the second phase of the project plans to build ******** million barrels of storage capacity (3 66,000 m³ floating roof storage tanks). As the EPC general contractor of the first phase of the project, CPP is responsible for the construction of 7 66,000m ³ crude oil storage tanks, 2 23,000 m³ crude oil pressure relief tanks, 2 10,000 m³ water storage tanks, as well as the design, acquisition, construction and trial operation of pumping stations, metering, water intake, power generation, communication, process pipelines, fire fighting and other systems supporting the storage tank ******** 招标范围:本次招标采购物资详见下表 Scope of Supply:
For the materials to be procured by the present Tendering, please refer to the table below.
S/N
Material Description/Specification
Main Technical Parameters
Unit
Quantity
Remark
1
通信散材
详见MTO Please refer to the attached MTO(其中的光缆、水泥、沙子均不在此采办包的采购范围内。)
******** 交货期 Delivery time:
下达订单后20周内交货伊拉克乌穆卡萨港,交货期超过26周将被否决(不足一周按一周计算)。
The delivery time to the UMM Qasr port,Iraq should be within 20 calendar weeks. If the delivery exceeds 26 calendar weeks should be rejected.(Less than one week is counted as one week).
招标人为****局伊拉克纳西里耶储油库项目部,项目资金来源已落实。本招标项目已按要求履行了相关报批及备案等手续,具备招标条件,现进行公开招标。
The project has implemented relevant procedures according to rules, regulations, and laws .as well as the capital has been confirmed. Now we hereby invite your esteemed company to participate in this bid. The tenderee is China Petroleum Pipeline Engineering Company Ltd (EPC) for New Nassiriya Depot Project, IraqDepartment.
二、项目概况与招标范围 Project Overview and Tendering Scope
********项目概况:伊拉****公司(State Company for Oil Project)计划在纳西里耶投资新建一个400万桶原油的罐区,用于接收Ahdeb、Badra、Gharaf、Nassiriya和Abu Amood油田的原油,项目一期计划建设252万桶库容量(7个********m³浮顶储罐),项目二期计划建设126万桶库容量(3个********m³浮顶储罐)。CPP作为该项目一期阶段的EPC总承包商,负责7个********m³原油储罐、2个******** m³的原油泄压储罐,2个******** m³水储罐建设,以及储罐区配套的泵站、计量、取水、发电、通信、工艺管线、消防等系统设计、采办、施工、试运工作。
Iraq's State Company for Oil Project plans to invest in a new 4 million barrel tank farm in Nasiriyah to receive crude from the Ahdeb, Badra, Gharaf, Nassiriya and Abu Amood fields. The first phase of the project plans to build ******** million barrels of storage capacity (7 66,000m ³ floating roof storage tanks), and the second phase of the project plans to build ******** million barrels of storage capacity (3 66,000 m³ floating roof storage tanks). As the EPC general contractor of the first phase of the project, CPP is responsible for the construction of 7 66,000m ³ crude oil storage tanks, 2 23,000 m³ crude oil pressure relief tanks, 2 10,000 m³ water storage tanks, as well as the design, acquisition, construction and trial operation of pumping stations, metering, water intake, power generation, communication, process pipelines, fire fighting and other systems supporting the storage tank ******** 招标范围:本次招标采购物资详见下表 Scope of Supply:
For the materials to be procured by the present Tendering, please refer to the table below.
S/N
Material Description/Specification
Main Technical Parameters
Unit
Quantity
Remark
1
通信散材
详见MTO Please refer to the attached MTO(其中的光缆、水泥、沙子均不在此采办包的采购范围内。)
******** 交货期 Delivery time:
下达订单后20周内交货伊拉克乌穆卡萨港,交货期超过26周将被否决(不足一周按一周计算)。
The delivery time to the UMM Qasr port,Iraq should be within 20 calendar weeks. If the delivery exceeds 26 calendar weeks should be rejected.(Less than one week is counted as one week).
本招标项目仅供正式会员查阅,您的权限不能浏览详细信息,请点击注册/登录,联系工作人员办理入网升级。
联系人:刘欣
电话:010-68809590
手机:13522553206(欢迎拨打手机/微信同号)
邮箱:kefu@bidnews.cn
相关项目推荐
- 杭州市临平区总工会2025年度第一期定期存款竞争性存放项目的招标公告 2025-06-12
- 营口市冬季清洁取暖散煤替代(大石桥市)高坎镇项目表后线、防冻液采购招标公告 2025-06-12
- 江西南铁劳动服务有限公司2025年南昌市西湖区天佑路23-3号商铺招标公告 2025-06-12
- 玛沁县各医疗机构2023年公卫资金采购项目的竞争性磋商公告 2025-06-12
- 2025-2026年度江北区文物监测服务项目的招标公告 2025-06-12
- 北方重工集团有限公司某项目液压缸采购招标公告 2025-06-12
- 芜湖市第一人民医院液氧采购项目招标公告 2025-06-12
- 许昌市中心医院转运车、负极板回路垫、冲洗液袋用加压器等项目市场调研公告 2025-06-12
- 中信银行昆明分行个贷委外催清收项目招标公告 2025-06-12
- 北方重工集团有限公司某项目锻件毛坯(跨焊)采购招标公告 2025-06-12
会员登录立即注册
客服电话
- 客服电话:010-6880 9590
- 招投标项目咨询:微信扫码,咨询刘欣
-
标书下载更多
- 500-750GHz频谱分析仪频率扩展器采购二次项目招标公告
- 惠州学院公共多媒体教室空调购置安装及系统集成项目二次招标公告
- 广东省四会监狱职工食堂餐饮服务采购项目(2025年)招标公告
- 广东技术师范大学工业信息技术应用创新公共实训中心项目招标公告
- 广东省高明监狱出租土地(鱼塘)配套设施维护项目竞争性磋商公告
- 微创多支搭桥手术器械(四次)招标公告
- 广东医科大学湛江校区7#、8#栋学生宿舍内饰及卫生间、沐浴间防水改造项目竞争性磋商公告
- 广东省海洋综合执法总队办公后勤保障服务项目(二次)竞争性磋商公告
- 郑州裕中能源有限责任公司3A氧化风机轴维修公开比价公告
- 学院2025年低压电控实验实训考核装置购置竞争性磋商公告